How GridMaus works.

From an address to a submitted application. GridMaus reads the capacity every network operator publishes, scores each connection point for your project, and helps you build the application.

From an address to a submitted application.

Three steps, the same for a 2 MW battery or a 40 MW data centre.

1

Screen a site

Type an address or drop a pin. See every connection point in range, scored for your size and type.

2

Compare and shortlist

Probability, lead time, cost, flexibility value and upstream limits, side by side.

3

Build the application

Turn the chosen option into a submission-ready pack and track it through to the offer.

See it working.

Real screenshots from GridMaus, taken from a live screening of a real site.

The GridMaus pipeline: a project moving from screening to energised
From screening to energisedOne card per connection pointHeadroom over time